QUARRYING PROCESS AND QUARRY PRODUCTS
Quarrying Process Quarry Products Page 2 of 8 After the face profiling survey, the drilling contractor arrives. Using an air operated drilling rig, he drills the number of shot holes required, at the marked spots corresponding to the hole positions on the blast design, at the angles and depths required. After the shot holes have been drilled, they are surveyed to